Construction History

Maple Shade Commons

Maple Shade Commons Construction History Page


May 8th, 2004 - NEW! Finally a nice warm day to put the finishing touches on our parking lot. The top coat of asphalt went down on Friday and the lines were painted on Saturday.

Maple Shade Commons welcomes our newest tenant Dr. Donald Rowe and his Chiropractic practice. Dr. Rowe will be moving in soon and will be welcoming new patients shortly. Call him at (724) 863-3080 to schedule an appointment today.

Two professional suites are available for immediate occupancy. Contact Jack George to see these beautiful suites that are conveniently located next to the well appointed shared Conference room.


February 22nd, 2004 -  Our first tenant, Real Estate Riches, Inc., is slated to move in this coming week. We welcome them, and are looking forward to a mutually prosperous relationship. Still remaining to lease is 700 sq. feet on the top floor and over 1,000. sq. feet on the first floor. The shared conference room (shown here) will be available to all tenants. The conference room has just been completed. It includes a brand new mahogany table , 8 executive leather chairs, a credenza and an enclosed white board. The beautiful flowering plant in the corner is a silk bougainvillea. Railings were also installed this week as well as mailboxes and sign posts.


February 15th, 2004  Rug cutting time finally came to Maple Shade Commons this past week. In fact carpets were cut, stretched, tucked and tacked. Things are really starting to get a finished look. Our tenants will get to know our cleaning supervisor Linda Sherman (shown here sorting supplies). She and her crew will keep our offices spic and span twice a week. Additionally, blinds were hung for the non-tinted windows, and the finishing touches were made to the bathrooms. We are doing everything possible to make a great working environment for all who choose Maple Shade Commons. Contact Dave now to learn more about how we can put a smile on your face when you come to work.


February 8th, 2004 The finishing touches are being applied to the top 2 floors of Maple Shade Commons. This past week more lights were installed. Interior wall trim was painted, cut to fit and put into place on the walls. Our door security keypad systems were installed and tested. Maple Shade Commons will be up and running shortly. We have over 2,000 sq. feet of exquisite build-to-suit office space still available. Contact Dave now for your personal tour of this premier facility.

 

 


February 1st, 2004   "Safety first" is a good rule to follow, and we are following it at Maple Shade Commons. Smoke detectors, pull stations and alarms were installed this week. On the exterior our attractive designer stucco was completed. However, the outside clean up will have to wait until warmer weather. We are on track for completion in just 4 short weeks with our first tenant moving in on March 1st.

 


January 25th, 2004 We can finally see the light at the end of the tunnel, and it looks to be fluorescent. Things will be winding down here over the next few weeks as major construction is soon to be completed. This week the plastering was finished, all the furnaces where made operational, doors where hung and more wiring was completed. Contact Dave now to reserve your office space at this great location.


January 18th, 2004  We just could not take anymore of this cold weather, so we went and got plastered. Well, at least our walls and ceilings did, and they are looking great. Outside, the application of stucco continued. Despite the low temperatures, tents where built and kerosene heaters were used to cure the product. In the attic the new furnaces were commissioned. Behind the scenes colorful carpet and high quality vertical blinds were ordered.


January 11th, 2004 This was a week of major happenings. On the outside our new sign was erected and lighting installed.  The stucco crew is systematically tenting-in sections of the exterior to allow the product to cure properly. Our new parking lot lights were installed, tested and will keep our building well lit and safe. On the inside drywall is being hung on the walls with care, and in just a few days plastering will begin. Contact Dave now for a personal tour of the building so we can customize some space for you. We will keep the light on for you!

   


January 4th, 2004  We are finally ready for the January weather as the last of our windows is installed. A sign says a lot about a business, and our new sandblasted and meticulously painted sign will say it for you loud and clear. Also, outside another one of our beautiful landscaping walls has been completed. On the inside the wiring was finished, and the plumber is trying to stay ahead of the last minute changes that are being handed to him. With any luck insulating will soon start. We plan to insulate all floors and walls not only for thermal purposes but also to keep the individual tenant spaces as quiet as possible.


December 28th, 2003 Santa brought us doors, windows and some decent weather. It is with much anticipation that the rest of the doors and windows are to be arriving this coming week. While plastic over the windows is a definite fashion statement, it is going out of style quickly at Maple Shade Commons. The wiring and plumbing continued inside as well. We are well on track for our March first completion date. Contact Dave now to reserve prime space for your professional office. 


December 21st, 2003   There is plenty to do inside while old man winter has taken control of the outside. 80% of the electrical wiring has been completed. The running of the Cat 5 high speed Internet cable and the phone lines has just begun. Two of the furnaces have been installed. Some of the new reflective windows have arrived and are in place. Our doors are scheduled to come tomorrow, and the rest of the windows are not too far behind.

   


November 28th, 2003  The exterior of the building is getting close to completion. We have been somewhat limited in finishing the stucco as we wait for our special order reflective windows to arrive. These widows along with the decorative stucco will set Maple Shade Commons apart from other professional office buildings. Interior framing continued and work on the buildings electrical system was started. Preparation work began on the exterior sign which we hope to have in place by the new year. With Christmas nearing temporary lighting was strung from the rafters with care in hopes that the electrical inspector would soon be there.

   


November 22nd, 2003  It was another busy week at Maple Shade Commons. The good weather allowed significant progress on the stucco. Concrete was poured, and framing was begun for the new ground floor vestibule. Concrete was also poured for the base of the large parking lot lights that will provide safety lighting. A power driven ditch digger was used to lay the conduit that will carry electrical wires for the signage and for the pole lights.

   


 

Home ] Amenities ] Contact ] Photo Gallery ] Plan Drawings ] [ Construction History ] Location ] Signage ] Tenants ] [ Conference Room Login ] [ Brochure ]

Maple Shade Commons
Jack George
Professional Offices Convenient to US Route 30 and the PA Turnpike in North Huntingdon, PA
Phone 724-872-6311 Fax 724-872-6998
Email: jack@pa-financial.com

 

L10 Web Stats Reporter 3.14 L10 Hit Counter - Free Web Statistics
LevelTen Web Design - Flash, Website Designers